
Steep Ascent, 10% Gradient Road Sign
Road signs - Steep ascent, 10% gradient The sign is made of 1 mm galvanised sheet steel, electrostatically painted and covered with Class I reflective sheeting
Price on request

Sheet Metal Road Signs
U38 Sign – Works in the Middle Lane, 65x85 cm, Class I U38 Sign – Works in the Middle Lane, 65x85 cm, Class I is part of the “Road signs” category in the E-TRAFIC.RO catalogue. Price is available on request; request a quote for your desired quantity and delivery location.
Price on request
We will send you a price as soon as possible, based on the quantity and delivery location.
U38 Sign – Works in the Middle Lane, 65x85 cm, Class I
A yellow 65x85 cm panel with a black border, warning of works in the middle lane of a road with three lanes in each direction, with Class I retroreflective sheeting. Beneath the “Roadworks” triangle, the middle lane line splits left and right, and black arrows show that traffic continues in the outer lanes.
When to use Class I
The Class I version is the economical choice for work sites on local roads: RA1 retroreflective sheeting with a service life of 7 years. The rule in SR 1848-2 is straightforward: a temporary sign must have at least the same class as the existing signs on the section, while Class 2 or 3 prismatic sheeting is required in areas with many light sources.
Where it is installed, according to SR 1848-1:2024
It is installed on road sections with three lanes in each direction where work is being carried out in the middle lane. SR 1848-1:2024 does not specify a particular distance for this sign: it is installed under the applicable technical regulations for roadworks signage and in accordance with the works signage plan. Like any sign, it is generally placed on the right-hand side in the direction of travel, so that it is visible from at least 50 m in built-up areas and at least 100 m outside them (SR 1848-2).
Roadworks requirements (Order 1112/411/2000)
The sign forms part of the advance signage, which is installed first, before the work zone in the direction of travel, with a clearance of at least 50 cm outside the carriageway. The regulations require signs to be placed on the ground first to check their visibility, and only then fixed to their supports; no more than two signs may be placed on the same support or alongside one another, and on one-way roads or bends they may be repeated on the left or above the road.
On public roads, works are signed in accordance with the methodological regulations approved by MI/MT Order No. 1112/411/2000. Road closures or traffic restrictions are approved by the road authority with the consent of the traffic police, based on a signage plan endorsed as final, a copy of which the contractor keeps at the work site. The contractor installs, supplements and maintains the signs throughout the works, removes them at the end and restores the original signage; the contractor bears full responsibility for accidents caused by incomplete or missing temporary signage.
At night, if the existing road signs are retroreflective, temporary signs must also be retroreflective and may be supplemented with flashing or sequential yellow lamps; on main and connecting urban roads, retroreflective temporary signs are supplemented with flashing yellow lamps.
Technical data
• yellow 65x85 cm panel with a black border, the “Roadworks” triangle and the middle lane splitting towards the outer lanes;
• 1 mm galvanised steel sheet with rounded corners and pressed edges, without sharp edges;
• electrostatically painted;
• Class I (RA1) retroreflective sheeting with a service life of 7 years;
• fixings included: 2 clamps for an Ø48 mm post and 4 bolts with nuts;
• compliant with SR EN 12899-1:2007, SR 1848-1:2024, SR 1848-2:2011 and SR 1848-3:2011.
Installation and format
Post fixings are included: 2 clamps for an Ø48 mm post and 4 bolts with nuts; clamps for an Ø60 mm post are supplied on request. The bottom edge of the sign is positioned 1.50–2.50 m above the road or pavement kerb, and the road-facing edge 0.50–2.0 m from the road platform.
U38 is a new sign introduced by SR 1848-1:2024, and SR 1848-2:2011 does not yet specify a format for it. The panel measures 65x85 cm, the format for rectangular temporary signs on streets and other roads; for other temporary signs, SR 1848-2 requires 80x120 cm on national roads and 120x180 cm on motorways.
SR 1848-1 code: U38
Standard designation: Works in the Middle Lane
Type: Temporary road sign
Shape and colours: Yellow 65x85 cm panel with a black border, the “Roadworks” triangle and the middle lane splitting towards the outer lanes
Size: 65x85 cm
Material: Galvanised steel sheet, 1 mm
Construction: Rounded corners, pressed edges, no sharp edges
Paint: Electrostatic
Retroreflective sheeting: Class I (RA1)
Retroreflection (white, 0.2°/5°): 70 cd/(lx·m²)
Sheeting service life: 7 years (SR 1848-2)
Fixings included: 2 clamps, 4 bolts with nuts
Compatible post: Ø48 mm (Ø60 mm on request)
Standards: SR EN 12899-1:2007, SR 1848-1:2024, SR 1848-2:2011, SR 1848-3:2011
Weight: 5 kg
Length: 65 cm
Height: 85 cm
U38 Sign – Works in the Middle Lane, 65x85 cm, Class I
fixings included: 2 clamps for an Ø48 mm post and 4 bolts with nuts;; compliant with SR EN 12899-1: 2007, SR 1848-1:2024, SR 1848-2:2011 and SR 1848-3:2011.; SR 1848-1 code: U38; Standard designation: Works in the Middle Lane; Type: Temporary road sign; Size: 65x85 cm.
The price of U38 Sign – Works in the Middle Lane, 65x85 cm, Class I is available on request and depends on the quantity and delivery location. Request a quote via the form, WhatsApp, phone 0744.52.53.54 or ofertare@e-trafic.ro.
E-TRAFIC.RO delivers by courier throughout Romania, typically within 1–3 business days. Payment is made on delivery or by bank transfer.
Yes. Public institutions can purchase products in the “Road signs” category through SEAP; send us your requirements and we will prepare a quote.

Road signs - Steep ascent, 10% gradient The sign is made of 1 mm galvanised sheet steel, electrostatically painted and covered with Class I reflective sheeting
Price on request

Road signs - Steep ascent, 7% gradient The sign is made of 1 mm galvanised sheet steel, electrostatically painted and covered with Class I E reflective sheeting
Price on request

Road signs - Customs Installed before a customs checkpoint. On encountering this sign, drivers must stop at the customs checkpoint. It prohibits passage through
Price on request

Road signs - Crosswinds The sign is made of 1 mm galvanised sheet steel, electrostatically painted and covered with Class I EG Prismatic (EGP) reflective sheeting with a coefficien
Price on request